An electronics manufacturer makes remote control devices for interactive-cable-TV systems.The following assembly tasks must be performed on each device.
a.Draw the precedence diagram for this problem.
b.What is the sum of the task times?
c.What cycle time will allow the production of 200 units over a ten-hour day?
d.What is the theoretical number of workstations needed?
e.Balance this assembly line using the heuristic most following tasks and the heuristic longest operation time.
f.How do these two solutions differ? Which do you prefer;why?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q132: A firm operates a flow shop building
Q139: A company is designing a product layout
Q141: A facility is trying to set up
Q286: Which of the following is a common
Q296: Which of the following is NOT a
Q307: Assembly line balancing has just been used
Q308: _ is the maximum time that the
Q310: Identify the five common layout heuristics used
Q317: A(n) _ line is a machine-paced product-oriented
Q319: What are the advantages and disadvantages of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents