PERT is a deterministic analysis tool allowing for precise times of activities within a project.
Correct Answer:
Verified
Q2: A PERT/CPM network is a graphical display
Q3: In CPM, crashing an activity that is
Q4: Before drawing a PERT or CPM network,
Q5: The identification of the project activities and
Q6: The optimistic time is the greatest amount
Q8: In PERT, the earliest start time for
Q9: CPM was developed for use in managing
Q10: CPM is a probabilistic analysis of managing
Q11: The first step in planning and scheduling
Q12: PERT and CPM are quantitative analysis tools
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents