The maintenance and evolution phase of the DBLC involves ____.
A) defining objectives
B) introducing changes
C) testing the database
D) installing the DBMS
Correct Answer:
Verified
Q41: The proposed system is subject to limits
Q44: The first step in developing the conceptual
Q53: A(n) _ is a carefully designed and
Q54: Once the data has been loaded into
Q58: After testing is concluded, the final _
Q63: The traditional SDLC phases are _,analysis,detailed systems
Q65: The _ design is the process of
Q66: An initial assessment of the information flow-and-extent
Q68: During decentralized design,after the _ process has
Q71: _ allow(s)physical access to areas by authorized
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents