In PERT, the earliest start time for an activity is equal to the latest of the earliest finish times of all of its immediate predecessors.
Correct Answer:
Verified
Q3: In CPM, crashing an activity that is
Q4: Before drawing a PERT or CPM network,
Q5: The identification of the project activities and
Q6: The optimistic time is the greatest amount
Q7: PERT is a deterministic analysis tool allowing
Q9: CPM was developed for use in managing
Q10: CPM is a probabilistic analysis of managing
Q11: The first step in planning and scheduling
Q12: PERT and CPM are quantitative analysis tools
Q13: The longest time path through a PERT/CPM