The expected time in PERT is
A) greater than the most likely time.
B) equal to the most likely time.
C) less than the most likely time.
D) Any of the above
E) None of the above
Correct Answer:
Verified
Q74: PERT stands for
A)probabilistic evaluation and review technique.
B)program
Q75: Which of the following questions can be
Q76: The work breakdown structure involves identifying the
Q77: Table 11-3 Q78: In PERT analysis,the probability of the optimistic Q80: Given an activity's optimistic,most likely,and pessimistic time Q81: Given an activity's optimistic,most likely,and pessimistic time Q82: Table 11-5 Q83: The project described by: Q84: Given an activity's optimistic,most likely,and pessimistic time Unlock this Answer For Free Now! View this answer and more for free by performing one of the following actions Scan the QR code to install the App and get 2 free unlocks Unlock quizzes for free by uploading documents