Pete has worked in maintenance at the hospital for 30 years and knows all of the things about the pipes and circuits that don't show up on the blueprints.He also knows which outside contractors and suppliers have been bargains,how long every remodeling job has taken,and which major power brokers in the hospital still have scores to settle.When a new project is in the conceptualization stage the hospital architect always calls on Pete to regale him with tales drawn deep from his memory banks so his knowledge can be leveraged to its fullest.In the language of project management,Pete is:
A) time warping.
B) chunking time.
C) positioning.
D) recapturing the past.
Correct Answer:
Verified
Q90: Risk taking can be encouraged in an
Q91: Which project champion role is least likely
Q92: A recent study of new product development
Q93: Your professor (yes,that person that has been
Q94: Tim slapped together his first web page
Q96: A champion that is an engineer,scientist,or similar
Q97: There is a significant chance that the
Q98: The traditional project champion duties of coordination
Q99: The salty project manager instinctively knew that
Q100: Which of the following is a non-traditional
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents