Use the scenario given below to answer the following question(s) .
Ray Inc.manufactures two types of gaming consoles,the sp2 hybrid and the sp3 hybrid models.The manufacturing process consists of two principal departments: design and production.The design department has 58 skilled workers,each of whom works 7 hours per day.The production department has 25 workers,who also work a 7-hour shift.On an average,to produce an sp2 hybrid,Ray Inc.requires 3.5 labor hours for design and 2 labor hours for production.The sp3 model requires 4 labor hours for design and 1.5 labor hours in production.The company anticipates selling at least 1.5 times as many sp3 models as sp2 models.The company operates five days per week and makes a net profit of $130 on the sp2 model,and $150 on the sp3 hybrid model.Ray Inc.wants to determine how many of each model should be produced on a weekly basis to maximize net profit.
-If the numbers of sp2 and sp3 hybrid gaming consoles produced each week are denoted as X1 and X2 respectively,the function that describes the design department's labor constraint for a week is ________.
A) 3.5X1 + 4X2 ≥ 2030
B) 3.5X1 + 4X2 ≤ 2030
C) 16X1 + 14X2 ≤ 8120
D) 16X1 + 14X2 ≥ 8120
Correct Answer:
Verified
Q12: Consider the scenario given below.Use Excel solver
Q13: A binding constraint is one _.
A)for which
Q14: In linear optimization,the phrase "cannot exceed" specifies
Q15: Use the scenario given below to answer
Q16: Consider the scenario given below.Use Excel solver
Q18: An optimal solution is _.
A)also known as
Q19: Use the scenario given below to answer
Q20: Consider the scenario given below.Use Excel solver
Q21: Use the scenario given below to answer
Q22: Use the scenario given below to answer
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents