Technical risk is the probability that the project will not perform to the required standards or produce substandard products or have excessive operating cost consumption.
Correct Answer:
Verified
Q42: Use the failure probability and consequence
Q44: The probability that the investments made to
Q44: The overall consequence of failure was 0.4
Q45: The overall project risk factor is
Q46: Your project team is interested in determining
Q48: The PostHoc Company specializes in justifying decisions
Q49: Sketch a 2 × 2 risk management
Q49: The overall project risk factor is
Q50: The overall risk factor for the
Q56: With a cost factor of 0.8,a schedule