Geoff coolly surveyed his earned value table at the conclusion of month 24.It was hard to believe that two short years ago,with his membership at Match.com about to expire,he had managed to craft an ad that was both urbane and manly enough as to catch the eye of the divine Miss Smylie.(The male model photo he substituted for his own certainly didn't hurt either. )Now he was almost done managing this critical project.Some might think him crass for taking such an approach,but he practiced what he preached at the small commuter school where he taught.Calculate all of the schedule and cost variances (costs in the table are in dollars)for this project and comment on Geoff's skills as a project manager.

Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q3: What is a tracking Gantt chart and
Q9: Identify a different key success driver and
Q17: Sketch the project control cycle and discuss
Q24: What are any four benefits to using
Q26: What are the problems with milestones as
Q35: What are drawbacks to a pure S-curve
Q79: What are the inputs and the steps
Q93: What is the significance of the 0/100
Q98: Briefly describe any seven critical success factors
Q110: Inspired by his trip to Greece,the gentleman
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents