Dummy activities have a duration equal to the:
A) slack on the critical path.
B) length of the predecessor.
C) length of the successor.
D) lag needed to preserve network logic.
Correct Answer:
Verified
Q63: An activity on an arrow network:
A)cannot have
Q64: Use the information in the table (all
Q65: It costs $75 per day for each
Q66: A project has the activity duration and
Q67: A project has the activity duration and
Q69: A project has the activity duration and
Q70: The critical path of this network is:
Q71: Use the information in the table (all
Q72: The fastest completion time for this project
Q73: A project has the activity duration and