Parker Woodworks manufactures baseball bats and wooden tops.Currently,Parker makes 5,000 baseball bats each month.Each bat uses $1.00 in direct materials and $0.50 in direct labor.Parker uses two activities in manufacturing the baseball bats: Cutting and Finishing.The cost associated with Cutting is $7,500 a month,allocated on the basis of direct labor hours.The cost associated with Finishing is $12,000 a month,allocated on the basis of batches.Usage of the activity drivers are as follows: What is the total manufacturing cost for one baseball bat?
A) $1.46
B) $1.50
C) $2.96
D) $3.94
Correct Answer:
Verified
Q75: Volume-based cost systems tend to:
A) Under-cost low-volume
Q85: When is a volume-based cost system appropriate
Q87: Which of the following is most likely
Q90: Garfield Personal Training Services is owned by
Q98: When a traditional,volume-based costing system is used,which
Q99: Appraisal or inspection costs are costs that:
A)are
Q107: Which of the following sets just-in-time systems
Q109: Which of the following involves analyzing the
Q114: When target costing is used,the target cost
Q118: Sonora,Inc.is launching a new product that it
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents