A Predetermined Overhead Rate Is Calculated Using Which Formula

Question 39

Multiple Choice

A predetermined overhead rate is calculated using which formula?


A) Actual manufacturing overhead cost/estimated units in the allocation base
B) Estimated units in the allocation base/estimated manufacturing overhead cost
C) Estimated manufacturing overhead cost/actual units in the allocation base
D) Estimated manufacturing overhead cost/estimated units in the allocation base

Correct Answer: