The net cost of normal spoilage in a job-order costing system in which spoilage is common to all jobs should be
A) assigned directly to the jobs that caused the spoilage.
B) charged to manufacturing overhead during the period of the spoilage.
C) charged to a loss account during the period of the spoilage.
D) allocated only to jobs that are completed during the period.
Correct Answer:
Verified
Q103: In a production environment that manufactures goods
Q104: In a job-order costing system,the net cost
Q108: As data input functions are automated,Intranet data
Q108: Broncho Company.uses a job-order costing system.During April,the
Q109: Spoiled units are
A)units that cannot be economically
Q111: Briggs Company Briggs Company uses a job-order
Q114: Normal spoilage is defined as unacceptable production
Q117: Which of the following would fall within
Q118: A service organization would be most likely
Q119: The use of standard material or labor
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents