You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day. Task times and precedence relationships are shown in the table below.
a. Draw the precedence diagram.
b. Determine the desired cycle time.
c. Determine the theoretical minimum number of stations needed.
d. Balance this line using most following tasks.
e. What is the efficiency of the line obtained in part d?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q99: A work cell is required to make
Q143: An assembly line with 11 tasks is
Q150: An electronics manufacturer makes remote control
Q151: An insurance claims processing center has
Q151: A work cell is required to make
Q152: An airport is trying to balance
Q154: There are three work centers (A,
Q156: A work cell is scheduled to build
Q158: A work cell is required to make
Q158: A company is trying to balance production
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents