A product design team is preparing to build a new doohickey. A doohickey consists of one A module, one B module, and one C module. There are different versions of these modules available in the company's design library. For example, there are two choices for A: A1 is .99 reliable, while A2 is .975 reliable. The table below details the choices available, along with the cost of each choice.
 Module variation  Reliability  Cost, each  A1 .99$17 A2 975$10 B1 995$4 B2 992$3 C1 98$2 C2 90$0.50 C3 60$0.25\begin{array} { | l | l | l | } \hline \text { Module variation } & \text { Reliability } & \text { Cost, each } \\\hline \text { A1 } & .99 & \$ 17 \\\hline \text { A2 } & 975 & \$ 10 \\\hline \text { B1 } & 995 & \$ 4 \\\hline \text { B2 } & 992 & \$ 3 \\\hline \text { C1 } & 98 & \$ 2 \\\hline \text { C2 } & 90 & \$ 0.50 \\\hline \text { C3 } & 60 & \$ 0.25 \\\hline\end{array} Help the design team by selecting the least costly version of a doohickey that has system reliability of at least .96. Draw a schematic of your finished design.

Correct Answer:

verifed

Verified

Students will need to solve this problem...

View Answer

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents