Scheduling is rather straightforward in product-focused facilities because
A) kanban automates the scheduling of the assembly line.
B) demand is reasonably stable, and capacities, set-up times, and run times are generally known.
C) assembly line balancing assures the highest possible production efficiency.
D) finite capacity scheduling has made MRP much more realistic.
E) equipment utilization is low.
Correct Answer:
Verified
Q7: Short-term schedules are prepared:
A) directly from the
Q21: Forward scheduling
A) begins with a delivery date,
Q22: The objective of scheduling is to
A) maximize
Q28: The sequence of decisions that affect scheduling
Q32: The jobs listed below needed to
Q33: The three components that can lead to
Q35: Which of these is not part of
Q38: Which scheduling technique should be employed when
Q40: Which of the following best describes the
Q108: In manufacturing scheduling, physical inventories of goods
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents