One component of lead time,setup time,is often the biggest bottle neck.
Correct Answer:
Verified
Q20: General purpose machines are an example of
Q21: One benefit of small lot production is
Q21: A poka-yoke is any foolproof device that
Q23: The concept of cellular layouts was developed
Q24: Poka-yolk is a Japanese term used to
Q25: Total productive maintenance combines preventive maintenance with
Q26: The lower inventory levels resulting from small-lot
Q29: Lean concepts cannot be applied to services
Q34: The output of a manufacturing cell is
Q36: Setup time is not a component of