Management believes a critical piece of equipment is busy 85% of the time.How many observations should be taken if management wants to be 98% confident the estimate is within +2.5% of the actual proportion of time the equipment is in use?
A) 250 observations
B) 525 observations
C) 757 observations
D) 1,108 observations
Correct Answer:
Verified
Q16: How many cycles should be used in
Q17: Determining the length of time it takes
Q18: The normal times for basic,generic micro motions
Q19: Work sampling is a technique for determining
Q20: The basic principle underlying an incentive piece-rate
Q21: How many observations should be taken to
Q22: A work sampling study is being conducted
Q23: As part of a time study a
Q24: How many observations should be taken to
Q26: For a particular time study a company
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents