By comparing costs alone, the systems analyst can use break-even analysis to determine the break-even capacity of the proposed information system.
Correct Answer:
Verified
Q45: PERT diagrams are useful when activities can
Q46: Judging the feasibility of a proposed systems
Q47: When trying to define the problems, try
Q48: The main advantage of the PERT diagram
Q49: The length of the arrows in a
Q51: Technical feasibility is dependent upon determining human
Q52: PERT is an acronym for Program Evaluation
Q53: PERT diagrams occasionally need to use dummy
Q54: Using a weighted average formula to determine
Q55: A PERT diagram does not allow for