Straker Industries Estimated Its Short-Run Costs Using a U-Shaped Average AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 }

Question 3

Multiple Choice

Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form AVC=a+bQ+cQ2A V C = a + b Q + c Q ^ { 2 } and obtained the following results.Total fixed cost (TFC) at Straker Industries is $1,000.  Straker Industries estimated its short-run costs using a U-shaped average variable cost function of the form  A V C = a + b Q + c Q ^ { 2 }  and obtained the following results.Total fixed cost (TFC) at Straker Industries is $1,000.   At what level of output is average variable cost (AVC) at its minimum point for Straker Industries? A) 0.14 B) 4.7 C) 7 D) 14 E) 28 At what level of output is average variable cost (AVC) at its minimum point for Straker Industries?


A) 0.14
B) 4.7
C) 7
D) 14
E) 28

Correct Answer:

verifed

Verified

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents