Parker Woodworks manufactures baseball bats and wooden tops.Currently,Parker makes 5,000 baseball bats each month.Each bat uses $1.00 in direct materials and $0.50 in direct labor.Parker uses two activities in manufacturing the baseball bats: Cutting and Finishing.The cost associated with Cutting is $7,500 a month,allocated on the basis of direct labor hours.The cost associated with Finishing is $12,000 a month,allocated on the basis of batches.The activity drivers are used as follows:
What is the total manufacturing cost for one baseball bat?
A) $1.46
B) $1.50
C) $2.96
D) $3.94
Correct Answer:
Verified
Q74: Cottonwood,Inc.produces two different products (Standard and Luxury)using
Q75: Volume-based cost systems tend to:
A)under-cost low-volume products
Q76: Calverton,Inc.produces two different products (Standard and Luxury)using
Q77: Jackson,Inc.produces two different products (Product 5 and
Q78: Calverton,Inc.produces two different products (Standard and Luxury)using
Q80: Cottonwood,Inc.produces two different products (Standard and Luxury)using
Q81: Which of the following is not a
Q82: The approach to cost management that calls
Q83: Firms that use JIT often rely on:
A)fewer
Q84: Prevention costs are costs that:
A)are incurred to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents