A problem with the pre-/post-measure of training evaluation is _____.
A) the difficulty of constructing a good test
B) the difficulty of determining whether employees were randomly assigned to the control group
C) determining the level of trainee competence at only one point in time
D) determining if the training was responsible for any changes in performance
Correct Answer:
Verified
Q38: Which of the following is true about
Q39: Dr. Smith, a veterinarian, has hired Carlos
Q40: Cole, the Director of Training for a
Q41: In the context of training needs assessment,
Q42: An effective way to determine if a
Q44: Andrew is enrolled in a university course
Q45: Orientation is the planned introduction of new
Q46: An artificial surgical environment in which a
Q47: In her evaluation sheet, Theresa, a soft
Q48: A learning culture can be created in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents