Lambhair Corp. contracted with Prof. Jones for a two week series of seminars with employees in the Appliance Division. Prof. Jones put in ten days of specific preparation only to have the series cancelled at the Appliance Division and rescheduled at the Tool Division. This change required Prof. Jones to put in another five days of specific preparation. This change was a breach of the original contract. Prof. Jones is entitled to what type of damages?
A) nominal
B) reliance
C) consequential
D) general
E) expectation
Correct Answer:
Verified
Q1: A genuine estimate of damages contained in
Q2: Consequential damages are
A) those that do not
Q3: What are the implications when damages "flow
Q4: In a case where a party to
Q5: When a breach of contract has occurred
Q7: An award of damages
A) usually accompanies a
Q8: Specific performance will NOT generally be available
Q9: General damages are
A) an award of a
Q10: Ralph ordered the installation of a satellite
Q11: Farmer Gibson ordered an irrigation pump from
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents