Solved

At a New Watch Assembly Plant,a Job Is Divided into Three

Question 78

Multiple Choice

At a new watch assembly plant,a job is divided into three work elements.The element times for the first four cycles are recorded by the continuous method and are presented below along with a performance rating factor (RF) for each element.
 Observation (time in min)   Work Element 1234RF10.502.324.226.161.021.453.245.207.061.131.873.625.617.490.9\begin{array} {r } { \text { Observation (time in min) } } \quad \quad \\\begin{array} { | c | c | c | c | c | c | } \hline \text { Work Element } & 1 & 2 & 3 & 4 & \mathrm { RF } \\\hline 1 & 0.50 & 2.32 & 4.22 & 6.16 & 1.0 \\\hline 2 & 1.45 & 3.24 & 5.20 & 7.06 & 1.1 \\\hline 3 & 1.87 & 3.62 & 5.61 & 7.49 & 0.9 \\\hline\end{array}\end{array}
The standard time for this job,assuming that the allowance is 18 percent,is


A) fewer than or equal to 1.9 minutes.
B) greater than 1.9 minutes but fewer than or equal to 2.0 minutes.
C) greater than 2.0 minutes but fewer than or equal to 2.1 minutes.
D) greater than 2.1 minutes.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents