Larry's Wickets,Inc.is producing two types of products: A and B.Both are produced at the same machining operation.Because of demand uncertainties,the operations manager obtained three demand forecasts (pessimistic,expected,and optimistic).The demand forecasts,batch sizes (units/batch),processing times (hr/unit),and setup times (hr/batch)follow.
Time Standard Demand Forecasts (000 units/yr)
The machines operate on two 8-hour shifts,5 days per week,and 50 weeks per year.The manager wants to maintain a 20 percent capacity cushion.
a.What is the minimum number of hours required of the machining equipment for the next year?
b.How many hours of capacity can the company expect from each machine?
c.What is the minimum number of machines needed (assuming no reliance on short-term options)?
d.What is the maximum number of machines needed (assuming no reliance on short-term options)?
Correct Answer:
Verified
Scenarios that can be met wi...
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q68: What is the meaning of diseconomies of
Q71: More complex waiting- line problems must be
Q116: The single milling machine at Fred's Manufacturing
Q121: Explain the meaning and significance of the
Q127: Within a process, what is a bottleneck?
Q134: Explain the relationship between throughput time and
Q136: What is the capacity cushion and how
Q139: Explain the distinction between blocked and starved
Q141: Mr.Grant is considering a capacity expansion
Q143: The Union Manufacturing Company is producing
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents