Table 9.23
The Terminal Company is attempting to balance its assembly line of high-voltage electrical connectors. The desired output for the line is 50 connectors per hour, and the information on the work elements for this assembly line is as follows.
-Use the information from Table 9.23,and the longest work-element rule to balance this line.If the time needed to perform work element K was reduced by 1 second and all other work element times were unchanged,what would happen to the number of stations needed to balance the line?
A) It would stay the same.
B) It would decrease by 1 station.
C) It would decrease by 2 stations.
D) It would increase by 1 station.
Correct Answer:
Verified
Q7: Build- It- Fast Inc. is analyzing the
Q86: _ is the process of determining a
Q107: The objective of the load-distance method is
Q126: An advantage of _ layouts
Q129: A(n) _ factor is one that
Q130: _ is the distance between two
Q138: _ is a key factor in
Q143: _ involves decisions about the physical
Q145: A(n) is anything that consumes space, such
Q175: Table 9.23
The Terminal Company is attempting
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks