In a tilt- up wall construction system, the walls are
A) precast in a plant and transported to the construction site for erection.
B) precast at the construction site.
C) cast in place at the construction site.
D) B or C, whichever is more economical.
Correct Answer:
Verified
Q24: The most commonly used strength of concrete
Q25: What are the bond beams in masonry
Q26: The adjacent corner tilt- up wall panels
Q27: Insulating concrete forms can only be used
Q28: The pipe braces that support concrete tilt-
Q30: In a sandwich tilt- up wall panel,
Q31: The adjacent noncorner tilt- up wall panels
A)are
Q32: The most commonly used exterior finish on
Q33: The foundations for concrete tilt- up walls
Q34: Reinforced- concrete tilt- up walls are generally
Unlock this Answer For Free Now!