Blocking between floor joists is required where
A) the joists bear on a beam.
B) the joists bear on a wall.
C) the joists are hung on a beam using joist hangers.
D) all of the above.
E) both A and B.
Correct Answer:
Verified
Q34: A wood light- frame building is essentially
Q35: If the cross- grain lumber dimensions in
Q36: Hold- down bolts, when provided in a
Q37: The structure below the podium in a
Q38: A floor in a WLF building that
Q40: The podium structure in a podium- type
Q41: Balloon- frame wood construction preceded the contemporary
Q42: In platform- frame construction, the wall framing,
Q43: Explain what a floor framing plan is.
Q44: If a ridge beam is used in