An assembly line with 30 activities is to be balanced.The total amount of time required for all 30 activities is 45 minutes.The line will operate for 360 minutes per day.Which of the following must be the cycle time to achieve an output rate of 200 units/day?
A) 0.66 minutes
B) 1.5 minutes
C) 1.8 minutes
D) 4.5 minutes
Correct Answer:
Verified
Q3: One of the differences between product layouts
Q12: The objective of assembly-line balancing is to:
A)
Q13: Which of the following is true of
Q14: _is vertical expansion of job duties to
Q17: One of the disadvantages of a product
Q19: In a cellular layout, the procedure of
Q28: Identify the most suitable layout for a
Q28: A _ is a reasonable estimate of
Q30: Megan plans the facility layout of her
Q32: The first approach to designing process layouts
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents