Why It Is Necessary to Make Sure a Project Is

Question 303

Multiple Choice

Why it is necessary to make sure a project is in the same risk class as existing operations before using the WACC as the discount rate?


A) If a project has high risk, then it should be rejected.
B) A firm that uses its WACC to evaluate projects without regarding the risk class of the project will tend to become riskier over time.
C) Only projects with similar risk can result in positive NPVs.
D) If a project is in a different risk class then a different tax rate must be used.
E) The risk class of a proposed project is important only if it affects the firm's bond ratings.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents