In determining if a process is to be automated,the project team will do all of the following EXCEPT:
A) Weigh the costs
B) Redraw the logical DFD as a combined logical/physical DFD
C) Determine benefits
D) Evaluate the efficiency
E) Consider the integrity of the process to the system
Correct Answer:
Verified
Q10: When you are updating the data elements
Q11: Which is NOT true of structure charts?
A)They
Q12: The fifth step in creating a Physical
Q13: A general suggestion about using couples in
Q14: The third step in creating a Physical
Q16: Pseudocode is:
A)The same as structured English
B)A technique
Q17: The Human-Machine Boundary
A)Is the keyboard and screen
B)Builds
Q18: Beth is considering a simple process for
Q19: When changing a logical DFD into a
Q20: Which of the following is NOT true?
A)Analysts
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents