Adding new requirements to a project after the system design has been finalized is called "requirements creep".
Correct Answer:
Verified
Q43: With some software systems,a day of down-time
Q44: By the time the design phase is
Q45: When creating a project plan,project analysts normally
Q46: System documentation takes all the processes,notes,diagrams from
Q47: If a program module is taking longer
Q49: The critical path is the fine line
Q50: If a mismatch exists between available programming
Q51: Testing is considered as a prized activity
Q52: Testing and programming are tightly coupled.
Q53: An ironic fact of systems development is
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents