It has been a busy project experience for Omar.During the analysis phase,he encountered some negative feedback from users.During design,his best user-interface analyst left for a new position and a novice user-interface designer took over.And during the coding,the team had to rely on some off-shore developers who had trouble understand the programming specifications.To get the system running as expected,the testing time was reduced.Which of the following conversion approaches might be the safest approach for Omar and the project team?
A) direct,whole-system,simultaneous conversion
B) parallel,pilot site,simultaneous conversion
C) direct,phased,simultaneous conversion
D) direct,pilot and phased conversion
E) parallel,modular and top-down conversion
Correct Answer:
Verified
Q9: Considering conversion style,conversion locations,and conversion modules,the most
Q10: Early adopters in the new customer resource
Q11: When considering costs of a new system
Q12: Which is NOT a basic tool for
Q13: Connie knows that _ when trying to
Q15: The two types of conversion modules are:
A)whole-system
Q16: A comment about why people resist change
Q17: One of the problems with a parallel
Q18: Plans to handle potential business disruption due
Q19: A lot of the 'unfreeze' part of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents