You have been called in as a consultant to set up a kanban control system. The first thing you do is to determine the number of kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 1,200 per hour. You estimate the safety stock should be set at 5% of the demand during lead time. The tote trays used as containers can hold 2 units of stock and the lead time to replenish an order is 10 hours. Which of the following is the number of kanban card sets necessary to support this situation?
A) 5,000
B) 5,500
C) 6,300
D) 6,500
E) 7,000
Correct Answer:
Verified
Q25: Automation is a key to lean procurement.
Q42: When implementing a lean production system, a
Q43: The Toyota Production System identified which of
Q43: Applying lean concepts to logistics is difficult
Q45: The Toyota Production System identified which of
Q51: The Toyota Production System identified which of
Q56: Which of the following are elements that
Q62: In implementing a lean production system, you
Q73: In designing a lean production facility layout,
Q77: Which of the following address elimination of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents