If the lower limit for a p-chart computes to a number less than zero,this indicates:
A) that the lower limit should be set at zero.
B) that the process is out of control.
C) that an attribute measure is incorrectly used.
D) that a calculation error has been made.
Correct Answer:
Verified
Q56: Six samples of size 10 were collected.The
Q57: Statistical process control relies on _.
A)process capability
Q58: Control limits are often confused with _.
A)pre-control
Q59: A company wishes to monitor the
Q60: Which of the following is NOT one
Q62: Discuss the differences between attributes and variables
Q63: A specification is 50.0 cm ± 10.0
Q64: A canning company defines a "nonconformance" as
Q65: A _ monitors the fraction of nonconforming
Q66: x-charts are used for:
A)averages of variables data.
B)individual
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents