When using the beta distribution for estimating activity times,
A) the most likely time estimate can be positioned anywhere between the optimistic and pessimistic time estimates.
B) the most likely time estimate becomes the mean of the distribution.
C) we assume that the standard deviation is one- third the range between the optimistic and pessimistic time estimates.
D) an advantage is that the mode of the distribution is always equidistant from the end points of the distribution.
Correct Answer:
Verified
Q31: Why is knowing the critical path in
Q32: A(n) _ is an interrelated set of
Q35: _ refers to a network planning method
Q37: The _ cost refers to the additional
Q38: Many small incremental changes to project objectives,
Q39: A(n) _ determines the sequence for undertaking
Q41: A(n) _ chart is a project schedule
Q43: Why do managers want to know the
Q47: _ is the maximum length of time
Q131: What options do project managers have to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents