Table 13.8
Sunshine Manufacture produces three products, X, Y, and Z. The production of these end items is controlled by an MRP
system. Each end item X is assembled with two components of A and one component of B. Each end item of Y is assembled
with two components of C and one component of A, each component of C is manufactured from one unit of B. End item Z is
assembled from one unit of D and one unit of C, D is manufactured from one unit of A, and C is manufactured from one unit
of B.
-Use the information in Table 13.8. If item C has a manufacturing lead time of two weeks and a planned receipt of 65 units is needed in week 4, which of the following statements is TRUE?
A) The planned order release in week 2 for item C is 130 units.
B) The gross requirements for item B in week 2 is 65 units.
C) The gross requirements for item B in week 2 is 130 units.
D) The gross requirements for item B in week 4 are at least 65 units.
Correct Answer:
Verified
Q5: In MRP, a(n) _ is any item
Q12: In MRP, a(n) _ is an item
Q16: _ is a computerized information system developed
Q64: A(n) _ is a record of
Q67: _ demand occurs because the quantity
Q69: Explain why MRP does a better job
Q70: A(n) _ item is the final
Q72: _ are orders that have not
Q73: An _ is a company- wide
Q76: The _ is a record of all
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents