PERT (Program Evaluation and Review Technique) generally treats activity completion times as probabilistic and:
A) is used to construct a Gantt chart.
B) is used to determine the probability that a project will be complete within a given time frame.
C) can be used to determine the exact completion time of an activity.
D) can be used to determine the exact completion time of a project.
Correct Answer:
Verified
Q10: The earliest start time (ES) of an
Q11: A PERT/CPM network can be represented as
Q12: In project scheduling, activities:
A)must be completed sequentially.
B)are
Q13: Typically, the first step in project scheduling
Q14: In PERT, the acceptance of a Beta
Q16: GANTT stands for "Generalized Activity Normalization Time
Q17: The critical path is always unique.
Q18: Overall project completion time will not be
Q19: Using the Critical Path Method, the normal
Q20: A disadvantage of Gantt chart methodology is
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents