Preparing a PLC control process for initial start-up is known as commissioning.
Correct Answer:
Verified
Q35: An addressing conflict is caused by the
Q36: The processor of a PLC monitors its
Q37: PLC output modules may incorporate fuse or
Q38: The suspend instruction is used to trap
Q39: The contact histogram function is used to
Q41: A good location for a PLC enclosure
Q42: The diode used in the suppression circuit
Q43: PLCs are placed within an enclosure to
Q44: A leakage problem can occur when connecting
Q45: I/O leakage problems usually occur with devices