When replacing modules or working on equipment controlled by the PLC installation, the safest way to proceed is to:
A) de-energize the MCR coil.
B) block open the emergency stop switch.
C) remove the fuse from the circuit.
D) pull and lock the disconnect switch.
Correct Answer:
Verified
Q61: The actual status of output address 0:2/5
Q62: The output of 0:2/5 would be _
Q63: The _ is the target for the
Q64: Assume that the stop button was changed
Q65: PLC emergency stop circuits should be:
A)hardwired outside
Q67: A JSR instruction:
A)tells the processor to jump
Q68: Power to the processor module is controlled
Q69: The _ instruction stops the processor from
Q70: The use of the starter auxiliary contact
Q71: A JMP instruction is similar to a(n):
A)MCR
Unlock this Answer For Free Now!