The following information relates to Cranmore Manufacturing: To produce a unit of product: There is a wait time of 5 minutes before the cutting department begins a batch, 15 minutes between the cutting and welding departments, a move and pre-wait between welding and polishing of 12 minutes, and a move and pre-wait between the polishing and finishing departments of 8 minutes.
If Cranmore produces in batches of 10 units, how much time would have elapsed by the time the 10th unit is produced under a manufacturing cell environment (assuming the cell is processing continuously) ?
A) 60 minutes
B) 65 minutes
C) 150 minutes
D) some other amount
Correct Answer:
Verified
Q41: Reducing the time it takes to configure
Q42: The departments or cells which contain all
Q43: There are two basic types of non-value
Q44: The following information relates to Lancashire
Q45: In a traditional manufacturing setup
A)there is significant
Q47: The new product value stream focuses on
A)developing
Q48: The worth of one or more features
Q49: The order fulfillment value stream focuses on
A)developing
Q50: In a demand-pull system
A)production is triggered by
Q51: The methodologies and concepts adopted by just-in-time
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents