Which of the following is true in regards to a lean accounting system?
A) The cost of people with specialized skills, such as industrial engineers, are allocated to all manufacturing cells based on an activity driver.
B) Workers are multiskilled and responsible for setting up equipment, maintaining equipment, and operating equipment.
C) Implementing a value stream system will require more workers.
D) Workers are highly skilled in one specialized area or activity and are not expected to spend time on other value-added activities.
Correct Answer:
Verified
Q71: If a facility has costs of $100,000
Q72: The pursuit of perfection is realized in
A)zero
Q73: In a lean environment, many overhead costs
Q74: Why might labor costs be reduced in
Q75: The document used by the lean control
Q77: Based on the following information:
Q78: Emphasis on departmental efficiency by a firm:
A)causes
Q79: Which of the following is a reason
Q80: Based on the following information:
Q81: The productivity measure(s) in which inputs and
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents