If production was budgeted at 400 units and the actual production was 420 units, what would be the flexible budget variance for materials if the actual cost of materials was £4,150 and the budgeted cost per unit is £10?
A) £50 F
B) £200 U
C) £100 F
D) £150 U
Correct Answer:
Verified