Figure 16-5
Torino, SA., manufactures machine parts. Torino has developed a static budget for its plant at an activity level of 10,000 direct labour hours for the month of March. The actual level of activity was 11,000 hours. The following table summarizes the static budget and the actual costs for March:
-Refer to Figure 16-5. What is the flexible budget variance for March?
A) £-0-
B) £1,200 F
C) £900 U
D) £1,100 F
Correct Answer:
Verified
Q41: Figure 16-5
Torino, SA., manufactures machine parts.
Q42: Which of the following must be addressed
Q43: A manager of a profit centre:
A)does not
Q44: Which cost centre listed below is evaluated
Q45: What results could be expected by placing
Q47: Which of the following departments is likely
Q48: Glock, SA., is looking for feedback
Q49: Figure 16-5
Torino, SA., manufactures machine parts.
Q50: Controllable costs are those that a manager
A)has
Q51: Figure 16-5
Torino, SA., manufactures machine parts.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents