Figure 11-2
Owens Ltd. produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers: Activity drivers for each activity have been identified and their practical capacities listed: The costs of facility-level activities are assigned using machine hours.
-Refer to Figure 11-2. What is(are) the batch-level activity(ies) ?
A) engineering
B) setups
C) inspecting
D) all of the above
Correct Answer:
Verified
Q12: If activity-based costing is used, electricity usage
Q13: Figure 11-2
Owens Ltd. produces specially machined
Q14: Which of the following quantities is an
Q15: If activity-based costing is used, product inspections
Q16: Figure 11-1
Ubben Manufacturing uses an activity-based
Q18: The use of unit-based activity drivers to
Q19: Figure 11-2
Owens Ltd. produces specially machined
Q20: Figure 11-2
Owens Ltd. produces specially machined
Q21: Which of the following items would be
Q22: Resources that are only purchased precisely at
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents