Tough Hardware purchases raw materials and processes those purchases through a receiving/inspection process prior to stocking for production. Tough places three purchase orders for materials for production and receives the goods that day. The first purchase order is for 2,500 1/2" × 96" milling blanks at $2.75 each. The second is for 4,000 pieces of 48" × 96" × 1" sheet steel at $15.55 each. The third purchase order is for five 5-gallon drums of milling lubrication oil at $475.00 per barrel.?
The receiving/inspection process is completed and the goods are transferred from Receiving Inventory to Raw Materials. The Receiving/Inspection Department assigns manufacturing overhead of $55.00 per purchase order as well as $2.75 per piece on metal goods and $35.00 per container on fluids. All labor is allocated through overhead.
(a) Prepare the journal entry to purchase and receive these items to Receiving Inventory on account.
(b) Assign overhead to the metal goods.
(c) Assign overhead to the fluid goods.
(d) Transfer all goods to Raw Materials Inventory.
Correct Answer:
Verified
Q188: Eagle Co. manufactures bentwood chairs and tables.
Q189: Everett Company's inventory at December 31
Q190: On March 1, Upton Company's Packaging Department
Q191: Fast-Flow Paints produces mixer base paint through
Q192: The cost of energy consumed in producing
Q193: A firm produces its products by a
Q194: Zang Co. manufactures its products in a
Q195: Discuss how equivalent units are computed under
Q197: The cost of materials transferred into the
Q198: Describe the flow of materials in a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents