At the start of 2017, Capital Cemetery determined its standard labor cost to be 2.5 hours for each cemetery plot prepared at $14.00 per hour.The budget for variable overhead was $8 per plot and budgeted fixed overhead was $15,000 for the year.Overhead is applied based on the number of plots prepared.The company expects to prepare 5,000 plots during 2017.During 2017, the actual cost of labor was $14.30 per hour.Capital prepared 4,900 cemetery plots requiring 11,700 direct labor hours.Actual overhead for the year was $52,100.How much is the controllable overhead variance?
A) $1,800 favorable
B) $300 unfavorable
C) $2,100 favorable
D) $800 favorable
Correct Answer:
Verified
Q86: Rodchester Company uses standard costing.Overhead is
Q87: Ultimate Production manufactures radon detectors.The standard for
Q88: Steep, Inc.budgeted 6,000 cup holders for
Q89: Which of the following is not a
Q90: For what reason(s) might the overhead volume
Q92: Under what condition(s) might a favorable variance
Q93: Straton Company produces one product, the H2001.Each
Q94: What does the overhead controllable variance indicate?
A)The
Q95: At the start of 2017, Capital Cemetery
Q96: Hanson produces pressure washers.The detail for
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents