The Calculation for the Predetermined Overhead Rate Is

Question 91

Multiple Choice

The calculation for the predetermined overhead rate is


A) estimated overhead cost times the estimated level of the allocation base.
B) estimated overhead cost divided by the estimated level of the allocation base.
C) estimated level of the allocation base divided by the estimated overhead cost.
D) estimated overhead cost minus the actual overhead cost.