Job cost sheets for Howard Manufacturing are as follows:
Instructions
(a) Answer the following questions.
1. What was the balance in Work in Process Inventory on July 1 if these were the only unfinished jobs?
2. What was the predetermined overhead rate in June if overhead was applied on the basis of direct labor cost?
3. If July is the start of a new fiscal year and the overhead rate is 20% higher than in the preceding year, how much overhead should be applied to Job 210 in July?
4. Assuming Job 210 is complete, what is the total and unit cost of the job?
5. Assuming Job 211 is the only unfinished job at July 31, what is the balance in Work in Process Inventory on this date?
(b) Journalize the summary entries to record the assignment of costs to the jobs in July. (Note: Make one entry in total for each manufacturing cost element.)
Correct Answer:
Verified
Q164: Lando Company reported the following amounts for
Q165: The gross earnings of factory workers for
Q166: Foster Manufacturing uses a job order cost
Q167: A job cost sheet of Fugate Company
Q168: Watson Manufacturing Company employs a job order
Q170: Builder Bug Company allocates manufacturing overhead at
Q171: Selected accounts of Kosar Manufacturing Company at
Q172: Graham Manufacturing is a small manufacturer that
Q173: Garner Company begins operations on July 1,
Q174: The following inventory information is available for
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents