The MPS is a vital link the production planning system because it: I. Keeps priorities valid.
II) Forms the basis for determining the capacity needed.
III) Is input to the material requirements plan.
IV) Is input to the production plan.
A) I, II, III and IV only
B) I, II and III only
C) I, II and IV only
D) II, IIII and IV only
E) I, II, III, and IV
Correct Answer:
Verified
Q5: The time span for which the master
Q6: In an assemble-to-order company, at which level
Q7: Which of the following is the term
Q8: The MPS is constrained by:
I. The availability
Q9: The information needed to develop a master
Q11: Which of the following is true concerning
Q12: The final assembly schedule as different from
Q13: Given the following table, calculate the
Q14: The final assembly schedule (FAS):
A) schedules customer
Q15: Which of the following is NOT an
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents